Stage 4 · Sustain · 08 · 25 min

Measure results against targets

Go-live is not the finish line. The charter is.

The redesigned process has run for a full quarter. This module checks it against the targets the managing director signed in module 5: with KPIs that are defined properly, a scorecard, a look at the automated steps and a control chart that tells real change from noise.

Apply

1. Make sure each KPI is complete

What you do here: separate complete KPI definitions from incomplete ones.

A complete KPI has three parts: what is measured per order, how it is aggregated over a period, and the target. Without all three, two people can read the same number differently.

Lab · Complete or not?0 of 6 placed

Which KPI definitions are complete?

Median lead time from enquiry to invoice, per month, target 21 days

5 more to place

Complete

Measure, aggregation and target

    Incomplete

    Something is missing

      Pair every speed KPI with a quality KPI. On-time delivery alone can be gamed by shipping parts that have not been inspected; first-pass yield next to it closes that door.

      Apply

      2. Compare results with the targets

      What you do here: read the scorecard and the realised benefit against the business case.

      Lab · Scorecard after one quarter1 of 3 · 0 correct

      Custom order process, the quarter after full rollout. For lead time and cost, lower is better.

      KPIBaselineTargetResult
      Median lead time, days282120.6
      Shipped by the promised date, %588586
      First-pass yield, %859288
      Process cost per order, EUR124010501070
      Customer score, 1 to 53.444.1

      Realised net benefit, annualised: EUR 141,168. Planned in the business case: EUR 204,672.

      How many of the five targets were met?

      Apply

      3. Watch the automated steps

      What you do here: judge the automated and AI steps by the same standard as everything else.

      Lab · How the new task owners perform1 of 2 · 0 correct

      Quarter after rollout.

      StepMeasureResult
      Fast-lane checkSmall variants cleared without engineer change81 %
      Fast-lane checkResults corrected by an engineer7 %
      AI-assisted order entryOrders corrected by the clerk, month 1 → month 312 % → 5 %
      Milestone messagesStatus enquiries per quarter412 → 160

      Engineers correct 7 % of fast-lane results. Good or bad?

      Apply

      4. Tell signal from noise

      What you do here: read a control chart and decide which movements need action.

      Every number moves a little from week to week. A control chart draws the normal range from the data itself: the centre line (CL) and upper and lower control limits (UCL, LCL). React to signals, not to every dip. Two common signals: a point outside the limits, or eight points in a row on one side of the centre line.

      On-time delivery per week after rollout, custom orders
      7085100UCL 99%CL 88%LCL 77%12345678910111213141516Week

      The limits come from weeks 1 to 8. Now read the weeks after them.

      Lab · Read the chart1 of 3 · 0 correct

      On-time delivery per week, in percent.

      WeeksValues
      1 to 888, 90, 81, 89, 91, 88, 90, 87
      9 to 1686, 85, 87, 84, 86, 85, 83, 84

      Week 3 dropped to 81 %. The head of Sales wants an investigation. Do you agree?

      Apply

      5. Decide what happens next

      What you do here: decide whether to sustain, adjust or roll back.

      Lab · The quarterly reviewYour call

      Three of five targets met, 69 % of the benefit realised, the automated steps within limits, and a downward drift in on-time delivery since week 9.

      What do you recommend to the process owner?

      The two open actions are where the next module starts.

      Reflect

      Check your understanding

      Three questions on the module.

      Lab · Check your understanding1 of 3 · 0 correct

      What makes a KPI definition complete?

      Take away

      What to keep

      • A KPI is measure, aggregation and target. Pair speed with quality.
      • Compare baseline, target and result, and realised against planned benefit.
      • Judge automated steps by end-to-end results, not by usage.
      • React to signals, not to noise: limits and runs on a control chart.
      • Sustain what works, and turn misses into the next cycle.

      After this module you can

      • Write complete KPI definitions and pair speed with quality
      • Compare results with targets and benefits with the business case
      • Judge automated and AI steps by their end-to-end effect
      • Read a control chart and react only to signals
      • Decide whether to sustain, adjust or roll back